facility relocation planning

Facility Relocation Planning: 5 Stages, 7 Questions

Most people running a facility move have never run one before. A person might relocate a warehouse twice in an entire career, which means facility relocation planning is usually handled by someone doing it for the first time, on a deadline, with a lease clock running.

That is the underlying problem. There is no way to know in advance which parts of the project carry risk, what a moving company should be doing months before the first truck, or what to ask the three vendors on your shortlist. Most people learn it while it is happening to them.

Here are the most common facility relocation planning pitfalls at each stage, and what they cost when nobody catches them early. The sections below cover why the planning window matters more than the drive, how the receiving end of a facility move sets the pace for everything else, and which line items tend to go missing from the quote you were given.

At the bottom of this blog is the full downloadable ebook where we dive further into what questions you should be asking before you sign with a mover.

The Trucks Are Rarely the Problem

Ask a project manager where these jobs go wrong and almost nobody says the highway.

The failures cluster at the receiving end. A crew arrives at a floor the electricians have not finished. Fifteen truckloads of fixtures pull up to a store with room for four. A crate that was supposed to be in a specific room by 10 a.m. is sitting in a warehouse with three hundred others and nobody can say which one it is.

None of those are driving problems. Each was set in motion weeks earlier by a question that did not get asked.

What the Planning Window Actually Buys You

The first stage of facility relocation planning starts months before anyone touches a box, and it is the stage most often compressed.

Interstate’s project managers say they need a few weeks of lead time before they handle anything, even on a small job. A full building with several floors needs a month or more. That time is not padding. Someone walks both buildings and determines where every item lands in the new space before any of it ships. Then they set the sequence everything arrives in.

It is also the only window where you can get every party onto one schedule. Your staff, the moving crew, the electricians, the furniture installers, the low-voltage contractor. Once those dates are locked, moving one means somebody else loses their slot. This is the work a dedicated project manager exists to do.

How Fast the New Building Can Take Deliveries

This is where most of these projects go wrong.

Most buildings have one service elevator, and you will probably be sharing it. Sometimes with a different moving company working another floor the same week. Trades will be occupying the rooms you need. Crews can work around them and come back, but only if somebody asked weeks earlier who else was going to be in the building.

The bigger constraint is floor space. Say fifteen truckloads of new fixtures are due at a retail location, and the location has room for four. The installers can only work so fast. Sending all fifteen creates a problem that no amount of good driving will solve. The answer has to be agreed in advance: hold the balance in a warehouse nearby and release it as room opens up.

Large projects usually have two clocks running at once. New equipment is arriving at a warehouse while the contents of the old building are going out. The two schedules depend on each other, and that only holds if everyone is reading the same plan.

The Line Items That Show Up After the Last Truck

The move is not finished when the last truck pulls away. Three things still have to happen, and each one waits on something different, so they often require more than one return visit.

That is what makes them cost more than people expect. A crew coming back for two hours of work still costs a crew and a truck for the trip. These are also the items most likely to be missing from the quote you were given.

One example. If your staff pack their own boxes, the crates and dollies get dropped off early, then sit in the new building for about a week while people unpack. Someone has to come back for all of it. That is a second visit with a crew, and it is rarely priced up front unless you ask.

The other two are covered in the guide below, along with why one of them should never be quoted in advance at all.

If you are reviewing a quote right now, those two are worth finding before you sign. Check the link at the bottom of this blog to download our Ebook: Where Facility Moves Go Wrong.

Questions Worth Asking Before You Sign

The full guide ends with seven. Here are two you can use today.

"Who compares what arrives against the supplier’s list, and what happens when the two do not match?" Before a truck arrives, the supplier sends a manifest. Somebody at your end has to check it against what actually comes off the truck. That sounds obvious and it often does not happen. There also has to be an agreed answer for the mismatch: who gets called, who covers the missing items, how long the crew waits.

"What is your USDOT number?" Every legitimate mover has one. You can look it up for free on the FMCSA’s SAFER Company Snapshot and see the carrier’s safety record before you sign anything.

Ask all three while you are still choosing. Once the contract is signed, these turn into status updates.

Get the Full Guide

Where Facility Moves Go Wrong walks through all five stages of a facility move, shows which stage tends to be most difficult depending on what kind of building you have, and closes with all seven questions to ask the moving companies on your list.

Download it below.

Interstate has been planning commercial and government moves from its Springfield, Virginia headquarters since 1943. If you have a facility move on the calendar and want to talk through the schedule, request a quote.